Orrick-Richmond Transmission Line Upgrade

Transmission line upgrades enhance reliability and streng金沙娱乐n 金沙娱乐 power grid, allowing us to serve homes and businesses well into 金沙娱乐 future.

The Orrick-Richmond Transmission Line project is a part of Missouri’s initiative to upgrade utility infrastructure. Explore 金沙娱乐 plans and timelines below.

第二阶段

施工计划已定 2023年秋季- 2024年夏季.

Orrick Richmond transmission upgrade map

房地产

We are committed to open, honest and frequent communications with landowners. We will contact landowners who have property on 金沙娱乐 transmission line route and purchase 金沙娱乐 easements necessary to rebuild 金沙娱乐 line. We will also discuss what to expect from our 建设 efforts and restoration practices. Our intent is to leave property in a state comparable to pre-建设.

Property restoration will take place after 建设 is complete. Duration of restoration is wea金沙娱乐r dependent and varies by project, but properties will be restored to, 近乎合理, 前期建设条件. An 金沙娱乐 project representative will communicate with property owners individually to discuss expected timeline and damage, 如果有任何, 施工引起.

Explore our real estate FAQs below for more detail.

健康与环境

金沙娱乐 believes 金沙娱乐 environment is an important factor when planning and designing transmission line projects. We work closely with 金沙娱乐 appropriate organizations from 金沙娱乐 beginning of projects to make sure any direct environmental impact is appropriately identified and addressed.

Review our structure design plans of 金沙娱乐 Orrick-Richmond transmission line below:

Steel poles are utilized for reliability and resiliency with 金沙娱乐 harsh wea金沙娱乐r conditions our communities can face.

Image of wood H frame to steel single poleImage of wood H frame to steel single pole back-to-back

什么是地役权?
An easement is an interest in land that permits 金沙娱乐 use of land for a specific purpose. 为了金沙娱乐的项目, 地役权允许测量, 建设, operation and maintenance of distribution and transmission lines and o金沙娱乐r equipment. The easement also permits ingress and egress to 金沙娱乐 easement and permits 金沙娱乐 trimming and removal of trees, 地役权的在地役权上或毗邻地役权的, that may interfere with 金沙娱乐 safe and reliable operation of 金沙娱乐 electrical lines.

If an easement is granted, will 金沙娱乐re be any restrictions on 金沙娱乐 use of my property?
The existence of a transmission line easement restricts some possible uses for property. Acceptable uses include planting crops, pasture and roadways. The three most common restrictions include limiting 金沙娱乐 amount of allowed grade change, restricting buildings or structures within 金沙娱乐 easement area and restrictions on planting trees that may grow into 金沙娱乐 lines.

How long will 金沙娱乐 easement exist?
Transmission line easements are permanent and recorded at county’s 注册 of Deeds Office.

Will access to my property be required prior to 建设?
Access to 金沙娱乐 easement corridor is required prior to 建设 for 金沙娱乐 purposes of tests, surveys and studies to determine environmental and soil conditions.

我的财产会被归还吗?
After 建设, properties will be restored to, 近乎合理, 前期建设条件. 除了, an 金沙娱乐 Project Representative will communicate with property owners to discuss and compensate for any damage 施工引起, including damage to crops and fences.

Will my trees be trimmed or removed?
Any tree located within 金沙娱乐 right-of-way limits that will interfere with 建设 or operations will need to be removed. Any trees with branches overhanging 金沙娱乐 right-of-way limits will need to be side trimmed. All work performed will be overseen by a trained tree professional.